NASA tests largest rocket parachutes ever for Ares I rocket
Washington, May 21 (ANI): NASA and industry engineers successfully completed the first test of the Ares I rocket's three main parachutes on May 21, which are the largest rocket parachutes ever manufactured.
The parachutes are designed to slow the rapid descent of the rocket's spent first-stage motor, permitting its recovery for use on future flights.
The Ares I, the first rocket in NASA's Constellation Program, is designed to launch explorers aboard the Orion crew capsule on journeys to the International Space Station, the moon and beyond.
The three main parachutes measure 150 feet in diameter and weigh 2,000 pounds each.
They are a primary element of the rocket's deceleration system, which also includes a pilot parachute and drogue parachute.
Deployed in a cluster, the main parachutes open at the same time, providing the drag necessary to slow the descent of the huge solid rocket motor to a soft landing in the ocean.
"The successful main chute cluster test today confirms the development and design changes we have implemented for the Ares I first stage recovery system," said Ron King, Ares I first stage deceleration subsystem manager for the Ares Projects at NASA's Marshall Space Flight Center in Huntsville, Alabama.
"Thanks to our great, collaborative team, the test went as anticipated, and all of our design objectives were met," he added.
Engineers from Marshall managed the team that conducted this first cluster test at the U.S. Army's Yuma Proving Ground near Yuma, Arizona.
This was the eighth in an ongoing series of flight tests supporting development of the Ares I recovery system.
Researchers dropped the 41,500-pound load from a U.S. Air Force C-17 aircraft flying at an altitude of 10,000 feet. The parachutes and all test hardware functioned properly and landed safely.
As the test series progresses, engineers will perform three classifications of testing: development, design load and overload.
Each level of testing is designed to fully test the performance of the new parachute design with different size payloads under varying conditions.
The next test in the cycle, scheduled for fall 2009, will involve the first design limit load test of a single main parachute. (ANI)
-
India vs New Zealand T20 World Cup 2026 Final: Five Positive Signs Favouring India Before Title Clash -
IND vs NZ Final Live: When and Where to Watch India vs New Zealand T20 World Cup 2026 Title Clash -
Ind vs NZ T20 World Cup 2026: New Zealand Needs 256 Runs To Beat India And Win The World Cup -
UAE Attacks Iran, Becomes 5th Nation To Enter War; Reports Suggest Strike On Iranian Facility -
ICC T20 World Cup 2026 Final: Ricky Martin, Falguni Pathak To Perform At Closing Ceremony, How To Watch -
Who Is Nishant Kumar: Education, Personal Life and Possible Political Role -
IND vs NZ T20 WC Final: New Zealand Win Toss, Opt To Chase; Why Batting First Could Be A Tough Call For India -
Gold Rate Today 8 March 2026: IBJA Issues Fresh Gold Rates; Tanishq, Malabar, Kalyan, Joyalukkas Prices -
From Kerala Boy To World Cup Hero: Sanju Samson’s 89-Run Blitz, His Birth, Religion, Wife And Inspiring Story -
Hyderabad Gold Silver Rate Today, 8 March, 2026: Latest Gold Prices And Silver Rate In Nizam City -
Panauti Stadium? Is Narendra Modi Stadium an Unlucky Venue for India National Cricket Team? -
Storm Over West Bengal Govt's 'Snub' To President Droupadi Murmu












Click it and Unblock the Notifications