Thane's Traffic Woes To End: New Six-Lane Elevated Road From Anand Nagar To Saket Announced
The Mumbai Metropolitan Region Development Authority (MMRDA) has announced the tender for a 6.30-kilometres-long elevated road in Thane, connecting Anand Nagar and Saket on the Eastern Express Highway (EEH), according to Hindustan Times. This project aims to alleviate traffic congestion on the city's major roads. An official stated, "The proposed road, costing Rs 1,699 crore, is expected to be completed in four years and will significantly smoothen traffic flow in the city."
Thane is poised for substantial infrastructure growth in the coming years, with several major projects either ongoing, stalled, or proposed. Since Chief Minister Eknath Shinde assumed office, Thane, his home turf, has seen numerous infrastructure initiatives. This new elevated road is part of Shinde's push for infrastructure development, promising a significant impact on the daily lives of Thane's residents.

Approved in 2023, the Anand Nagar-Saket elevated road will feature six lanes, enhancing traffic movement from Samruddhi Mahamarg and the Mumbai Nashik highway. The Thane Municipal Corporation had sought permissions, and the MMRDA will handle the construction, making this road a crucial part of Thane's first coastal highway project.
Additionally, the MMRDA is constructing another elevated road from Ghatkopar to Thane along the Eastern Express Highway, which will link Thane to the Eastern Freeway. Another significant project is the second coastal road from Gaimukh to Balkum. The MMRDA plans to concrete sections of Ghodbunder Road, from Kapurbawdi to Gaimukh, at a cost of Rs 395 crore.

In the most recent MMRDA meeting, the executive committee approved a tunnel from Gaimukh to Fountain Hotel, connecting Thane district with Palghar district, and an elevated road from Fountain Hotel to Bhayander. The MMRDA has called for consultants to design these projects and obtain environmental permissions. These initiatives are expected to be completed in five and a half years.
As traffic in Thane is anticipated to increase significantly in the future, these infrastructure projects are crucial. The Vadhavan port, once operational, will draw more business-related travel to the area, further increasing traffic. The Mumbai Vadodara Expressway will help divert heavy traffic, while the Thane Borivali Twin Tunnel and Mulund Goregaon Tunnel will improve East-West connectivity, easing the overall traffic burden in Thane.
-
Dhurandhar 2 Box Office Collection Day 5: Ranveer Singh Film Surges Ahead, Targets All-Time Records -
Hyderabad Gold Silver Rate Today, 24 March 2026: Gold Slips Further, Silver Sees Sharp Swings In Local Market -
Iran Rejects Trump’s Ceasefire Claim: Tehran Denies Talks, Calls It ‘US Retreat’ -
Platinum Rate Today, 24 March 2026: Demand Picks Up as Platinum Prices Ease Amid Gold Rally -
Tamil Nadu Opinion Poll: ANS Projects DMK Winning In 180 Seats In 234-Member Assembly -
Gold Silver Price Today, 24 March 2026: City-Wise Prices As MCX Gold And Silver Steady After Sharp Fall -
Gold Rate Today 24 March 2026: IBJA Rates Drop Sharply As Tanishq, Malabar, Kalyan Joyalukkas Prices Slip -
Chennai Gold Silver Rate Today, 23 March 2026: Gold Price Hits 4-Month Low, Silver Slumps Amid Market Volatily -
Bangalore Gold Silver Rate Today, 24 March 2026: Gold, Silver Prices Drop Sharply as Markets Remain Volatile -
Gold Silver Rate Today, 23 March 2026: City-Wise Prices, MCX Gold And Silver Extend March Weakness -
Dhurandhar 2 Box Office Collection Day 6: Ranveer Singh’s Film Stays Unstoppable at Box Office Despite Weekday -
Passengers Evacuated After Air Canada Plane Reportedly Hits Fire Truck At LaGuardia












Click it and Unblock the Notifications