What Is Kavach? Indian Railways Clears Rs 675 Crore Projects For Train Safety, Signalling And Freight Movement

In one of the biggest development, the Ministry of Railways has approved three major infrastructure projects worth a combined Rs 675 crore to improve passenger safety, modernise signalling and increase freight handling capacity across key railway routes.

Indian Railways
AI Summary

AI-generated summary, reviewed by editors

The Ministry of Railways approved Rs 675 crore for three projects: installing Kavach 4.0 in Moradabad (Rs 170 cr), adding electronic interlocking at 21 Samastipur stations (Rs 233 cr), and building an Adra-Joychandipahar bypass (Rs 272 cr) to enhance safety and freight capacity.

The projects will cover the Moradabad division in Uttar Pradesh, Samastipur division in Bihar and the Adra-Joychandipahar section in West Bengal.

The three initiatives focus on different areas of railway operations, from automatic train protection to modern signalling and a dedicated bypass for freight trains.

Rs 170 Crore For Kavach 4.0 In Moradabad

The Railways has approved Rs 170 crore for the installation of Kavach 4.0 on the remaining 712 route kilometres of the Moradabad Division of Northern Railway.
Kavach is India's indigenous Automatic Train Protection (ATP) system) developed to improve railway safety.

The system is designed to help prevent Signal Passing at Danger (SPAD), a situation in which a train passes a signal despite being instructed to stop.

Kavach can automatically apply brakes when required, regulate train speed in critical situations and help reduce the risk of train collisions.

The installation across the remaining route kilometres is expected to further strengthen safety on the Moradabad railway network.

Electronic Interlocking At 21 Samastipur Stations

Another Rs 233 crore has been approved for the Samastipur Division of East Central Railway. Under the project, electronic interlocking systems will be installed at 21 railway stations.

The existing panel interlocking systems will be replaced with modern computer-based technology.

Electronic interlocking can make railway signalling more reliable while helping railway staff identify faults and manage train movements more efficiently.

The upgraded signalling infrastructure will also provide a foundation for the future implementation of Kavach in the division.

Rs 272 Crore For Adra-Joychandipahar Bypass

The third project involves the construction of an 11-kilometre bypass line between Adra and Joychandipahar in West Bengal.

The South Eastern Railway project has been approved at a cost of Rs 272 crore.
Unlike the Kavach and signalling projects, the bypass will primarily focus on improving freight movement.

The new line is expected to reduce congestion and operational disruptions on the existing route, allowing freight trains carrying industrial goods to move more smoothly.
It will also create additional capacity for handling freight traffic as demand increases.

Three Projects, One Larger Railway Goal

The three projects address different challenges faced by Indian Railways.
Kavach 4.0 will strengthen train protection in the Moradabad division, while electronic interlocking will modernise signalling at 21 stations in Samastipur.

Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+