For Quick Alerts
ALLOW NOTIFICATIONS  
For Daily Alerts
Oneindia App Download

Train 18's first trial run tomorrow; Key features, All you need to know

|
Google Oneindia News

New Delhi, Nov 16: Train 18's first trial run will be conducted tomorrow (November 17) on Bareilly-Moradabad section on a standard railway track. Seen as successor of the Shatabdi Express, Train 18 is India's first engine-less train.

Research Designs and Standards Organization (RDSO) team has alrerady reached Moradabad for the trial run.

Train 18 is a swanky new train that would be capable of running at a speed of up to 160 kmph. Developed by Chennai's Integral Coach Factory (ICF) in 18 months, the full AC train is designed in such a way that passengers can have a look at the driver's cabin.

Key features of Train 18:

ICF developed Train 18 in 18 months and hence the name

ICF developed Train 18 in 18 months and hence the name

Train 18 has diffused lighting, automatic doors and footsteps beside GPS-based Passenger Information System. The footstep in a coach's doorway slides outward when the train stops at a station enabling passengers to alight safely with comfort. The footstep would adjust to the variation in height between a train's floor and the platform.

Plush interiors

Plush interiors

The train will also be fitted with CCTV, central air conditioning, diffused lighting, GPS-based passenger information systems, two executive compartments in the middle with 52 seats (as against the regular cabin's 78).

India's first engine-less train gets on track for trial runIndia's first engine-less train gets on track for trial run

Shatabdi's successor

Shatabdi's successor

The train has a self-propelled layout, which means that it does not have a standalone engine and instead has propulsion systems in each coach. The swanky 16-coach prototype without an engine will cut travel time by 15% compared to the Shatabdi. Train 18 comes with technical features for enhanced quick acceleration.

Travel time to come down by 15%

Travel time to come down by 15%

The train is being built by Integral Coach Factory and is going to be unveiled on October 28, 2018. It will go through testing and trial near the factory for about four days, before it gets handed over to the Research Design and Standards Organisation (RDSO) for further testing. Once the trains get approved, they will be a real boon to commuters.

For Daily Alerts
Get Instant News Updates
Enable
x
Notification Settings X
Time Settings
Done
Clear Notification X
Do you want to clear all the notifications from your inbox?
Settings X
X