Piyush Goyal reviews rail safety, emphasizes on according it top most priority
The new railway minister has set fresh deadlines to handle challenges.
Railway Minister Piyush Goyal on Friday chaired a high-level meeting on Safety with Railway Board officials. The meet was aimed at a comprehensive review of safety with the minister emphasized on according top most priority to it.

The Railway Minister directed to undertake five immediate measures to address the problem of unmanned level crossings and derailments. The elimination of all unmanned level crossings to be speeded-up in a big way, it was decided in the meeting. They are now targeted to be eliminated within a year compared with the earlier target of three years.
Minister of Railways and Coal Piyush Goyal on Friday held meetings with members of full Railway Board and Safety, Directorate of Railway Board to comprehensively review safety measures for train operations. A detailed presentation on safety was made at the meeting. There was a threadbare discussion on the subject and the root cause of repeated cases of train accidents in recent past was thoroughly analysed. In the meeting, the Minister emphasised that the safety is paramount and there cannot & should not be any compromise on this front.
The meeting highlighted two major causes leading to accidents:
a) Unmanned Level Crossings accounted for 34 per cent of accidents in 2016-17
b) Derailments due to defects in tracks
The special focus of the meeting was to identify measures to reduce accidents due to derailments which have emerged as one of the major causes of Train accidents.
Minister of Railways gave following directions to the Railway Board to ensure Safety:
- All unmanned level crossings should be eliminated expeditiously on the entire Indian Railway network in a year's time from now. The earlier target was to eliminate these in three years but by using the Transformative mantra of "Speed, Skill and Scale" this target has been expedited to less than 1 year now.
- Track Replacement or renewal should be accorded priority and the tracks earmarked for use for constructing new lines should be diverted to places or stretches which are prone to accidents and where replacement is due.
- The procurement of new rails should be expedited on a large scale with a view to complete construction of new lines in time.
- The manufacturing of conventional ICF design coaches should be stopped forthwith and new design LHB coaches only should be manufactured.
- Anti-Fog LED lights should be installed in Locomotives so that unhindered safe train operations can be ensured during fog season.
The Minister directed the Railway Board to monitor implementations of this action plan on a regular basis.
OneIndia News
-
LPG Crunch: Karnataka Brings New SOPs, Makes PNG Registration Mandatory for Businesses -
Hyderabad Gold Silver Rate Today, 30 March 2026: Check Fresh 24K, 22K, 18K Gold And Silver Prices In City -
Opinion Poll For Kerala Assembly Election 2026: Ldf Strength In Kannur And Kasaragod -
Tamil Nadu Polls 2026: Vijay Reveals Rs 645 Crore Assets, Rs 266 Crore in Banks; Know All His Declaration -
Mumbai Metro Line 9 Set for April 3 Launch, Dahisar-Mira Bhayandar to Get Direct Boost -
Trump Hints At Breakthrough With Iran Amid War Escalation, Calls Recent Move A ‘Sign Of Respect’ -
Rahul Arunoday Banerjee Autopsy Report: Actor Was Underwater For Over An Hour, Sand Found In Lungs -
West Bengal Assembly elections: Election Commission transfers heads of 173 police stations -
Delhi Weather Brings Relief: IMD Issues Yellow Alert For Rain, Thunderstorms And Gusty Winds; Check Forecast -
Tamil Nadu Elections 2026: Vijay Files Nomination Same Day as MK Stalin, Sets Up Symbolic Political Face-Off -
Too Close To Call? 57 Key Seats Could Decide West Bengal Election 2026 As TMC And BJP Gear Up For Tight Battle -
IPL 2026 RR vs CSK Live Streaming: How to Watch Rajasthan Royals vs Chennai Super Kings Match Today












Click it and Unblock the Notifications