For Quick Alerts
ALLOW NOTIFICATIONS  
For Daily Alerts
Oneindia App Download

Delhi’s 59-km Pink Line Metro now fully operational; becomes longest operational corridor

|
Google Oneindia News

New Delhi, Aug 6: In a major boost for Delhi Metro, a small segment of its Pink Line at Trilokpuri, which had proved a bottleneck for the DMRC authorities for a long time, was inaugurated on Friday, making it the longest operational corridor of the network.

With this, the 59-km-long Majlis Park-Shiv Vihar corridor or the Pink Line, which spans 38 stations, has been fully linked for the first time.

Delhi’s 59-km Pink Line Metro now fully operational; becomes longest operational corridor

Union Minister for Housing and Urban Affairs Hardeep Singh Puri and Delhi Chief Minister Arvind Kejriwal jointly inaugurated the section of about 289 metre between Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations, via video-conferencing.

 Delhi: Metro trains run at full capacity; standing not allowed in coaches Delhi: Metro trains run at full capacity; standing not allowed in coaches

The Pink Line was opened in multiple phases in 2018.

However, a small portion in east Delhi''s Trilokpuri area had become a bottleneck, due to which the line remained disjointed there.

Now, with the missing link plugged after much delay, Delhi Metro''s Pink Line has become its longest operational corridor.

And, it will also connect important landmarks of the city, such as the Anand Vihar Railway station, Anand Vihar ISBT, Nizamuddin Railway station, markets in South Extension, INA and Lajpat Nagar, officials said.

The end-to-end linking of the Pink Line will also immensely benefit residents of east Delhi or people travelling to that region, as the gap at Trilokpuri was causing the corridor to be operated in two separate segments.

The gap in the line was expected to be plugged by September 2020, but it was delayed due to repercussions of the COVID-19 pandemic, sources had said early October.

The bottleneck near Trilokpuri station had risen due to multiple issues, including land acquisition, resulting in a portion of the metro segment, then about a few kilometres, remaining incomplete, rendering the Trilokpuri Sanjay Lake station a terminus.

Passenger services on the line is slated to begin from 3 pm onwards on Friday.

DMRC authorities said with this seamless connectivity, commuters will also save time and money.

For Daily Alerts
Get Instant News Updates
Enable
x
Notification Settings X
Time Settings
Done
Clear Notification X
Do you want to clear all the notifications from your inbox?
Settings X
X