What Happens to the Land Acquired for Parandur Airport After Project Is Dropped? TVK Minister Answers

The TVK government is planning to use the lands acquired to now-dropped airport in Parandur for industrial development. .

Tamil Nadu Industries Minister S Keerthana told the Assembly on Tuesday that the land acquired for the Parandur airport would be considered for industries that do not affect local livelihoods and could generate jobs and economic activity in the region. The government is also looking for an alternative location for Chennai's second airport.

AI Summary

AI-generated summary, reviewed by editors

The Tamil Nadu government dropped the Parandur airport plan and will use the approximately 1700 acres of acquired land for industrial development, while seeking an alternative site for Chennai's second airport, stated Industries Minister S Keerthana.
What Happens to the Land Acquired for Parandur Airport After Project Is Dropped Minister Keerthana Explains

The proposed Parandur airport was expected to require around 5,746 acres. Of this, about 1,700 acres had already been acquired, according to the reports in the Tamil media.

The decision to drop the airport was announced by Chief Minister on Monday. The government cited the impact the project could have had on agricultural land, water bodies, farmers and residential settlements.

"I stand firmly with the people protesting against the airport to be established in Chennai's Parandur and 12 surrounding villages," CM Vijay said in the assembly.

Keerthana defended the decision, pointing out that the Parandur area has several water bodies connected to the Chembarambakkam lake system. She argued that building an airport in such a location could have increased the risk of flooding in Chennai.

The previous governments had initially proposed acquiring around 3,774 acres of private land and 1,972 acres of government land.

Reportedly, the DMK government offered compensation to landowners from ₹35 lakh to ₹60 lakh per acre. In some high-value pockets, it went as high as ₹2.57 crore per acre. Landowners were also offered alternative housing plots of five to 10 cents, along with 400 sq ft houses.

The issue of how much land had actually been acquired became a political flashpoint in the Assembly on Tuesday.

Tamil Nadu Law Minister Nirmal Kumar said only around 1,700 acres had been acquired and disputed a claim that 90% of the required land had already been acquired. DMK MLA EV Velu, however, said the 90% figure included government-owned land within the proposed airport site.

Kumar said, "Out of the 4,746 acres required for the project, 3,774 acres are private/patta lands. Of this, 2,681 acres are fertile, multi-crop agricultural lands. The remaining 1,972 acres have been classified as government land, but this includes 1,558 acres of active water bodies and streams."

The Chief Minister has already said the state will identify an alternative site where the acquisition of agricultural land and residential areas can be minimised. The existing Chennai airport is also expected to be expanded to handle rising passenger traffic.

However, Industries Minister Keerthana also rejected the argument that abandoning Parandur would immediately threaten Tamil Nadu's export economy.

Responding to claims that the state's exports would suffer without the new airport, she pointed out that a large share of exports currently moves through sea cargo and air cargo facilities at Chennai airport.

Can the acquired land simply be used for industries?

Land acquired for a specific public project cannot necessarily be treated as ordinary government land and diverted to another purpose without examining the legal basis of the acquisition and the conditions under which it was acquired.

This could become particularly important if former landowners seek the return of their properties after the airport project has been abandoned.

The government will therefore have to examine the legal status of each parcel and determine whether the acquired land can be retained and used for another public or industrial purpose.

Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+