Rains cause temporary suspension of Amarnath yatra
Jammu, July 20 (ANI): The ongoing annual Amarnath yatra was temporarily suspended this morning due to overnight rainfall around the holy cave.
The rain has resulted tracks leading to holy cave becoming slippery. The helicopter service from both Baltal and Chandanwari is operating as usual.
According to sources, a fresh group of pilgrims, who left the base camp this morning for Chandanwari, the last motorable halting station on this traditional route, were stopped at Sheshnag because of the slippery track.
The decision to allow the pilgrims to proceed towards the shrine from Sheshnag and other halting stations would depend on the weather.
Over 1.60 lakh pilgrims have paid obeisance to the holy cave since the commencement of the two-month-long pilgrimage from July 1.
The Amarnath cave shrine is dedicated to Lord Shiva and the main shrine is claimed to be over 5,000-years-old. (ANI)
-
LPG Crunch: Karnataka Brings New SOPs, Makes PNG Registration Mandatory for Businesses -
Hyderabad Gold Silver Rate Today, 30 March 2026: Check Fresh 24K, 22K, 18K Gold And Silver Prices In City -
Opinion Poll For Kerala Assembly Election 2026: Ldf Strength In Kannur And Kasaragod -
Tamil Nadu Polls 2026: Vijay Reveals Rs 645 Crore Assets, Rs 266 Crore in Banks; Know All His Declaration -
Mumbai Metro Line 9 Set for April 3 Launch, Dahisar-Mira Bhayandar to Get Direct Boost -
Trump Hints At Breakthrough With Iran Amid War Escalation, Calls Recent Move A ‘Sign Of Respect’ -
Rahul Arunoday Banerjee Autopsy Report: Actor Was Underwater For Over An Hour, Sand Found In Lungs -
West Bengal Assembly elections: Election Commission transfers heads of 173 police stations -
Delhi Weather Brings Relief: IMD Issues Yellow Alert For Rain, Thunderstorms And Gusty Winds; Check Forecast -
Tamil Nadu Elections 2026: Vijay Files Nomination Same Day as MK Stalin, Sets Up Symbolic Political Face-Off -
Too Close To Call? 57 Key Seats Could Decide West Bengal Election 2026 As TMC And BJP Gear Up For Tight Battle -
Kim Jong Un Oversees New Solid-Fuel Missile Engine Test, Claims Capability To Reach US Mainland












Click it and Unblock the Notifications