For Quick Alerts
ALLOW NOTIFICATIONS  
For Daily Alerts
Oneindia App Download

L

By Staff
|
Google Oneindia News

New Delhi, Feb 21 (UNI) Larsen&Toubro Ltd (L&T) today said its engineering and construction projects division has bagged a contract from Cairn India for Engineering Procurement and Construction (EPC) services for the Export Crude Oil Insulated Pipeline and Gas Pipeline from Barmer, Rajasthan to Salaya, Gujarat.

The scope of work involves the laying of a cross country 24 inch skin heat traced pipeline with PUF insulation for crude oil transportation from the Mangala terminal, located at Barmer, Rajasthan to the Salaya Oil Export terminal, near Jamnagar, said a statement.

The pipeline travels 330-kilometres south from the Mangala Field to a pump station and oil take off point at Viramgam.

From Viramgam the pipeline continues for 261 kms south west up to an export Oil terminal at Salaya.

Another pipeline of eight inch diameter will be laid for transporting Natural Gas from the Raageshwari Fields which will be laid alongside the 24-inch pipeline to the Salaya receiving facility for feeding the Gas generator sets located at 32 sites enroute.

These gas generator sets are meant primarily for producing electricity for 'Skin Effect Heat Management System' (SEHMS) to maintain the fluidity of the waxy crude.

L&T's Pipeline Engineering Centre - L&T Gulf located at Faridabad, is a Joint Venture of L&T and Gulf Interstate, Houston.

The multi-million dollar project is slated for commissioning by June 2009.

UNI PBB SR AS1409

For Daily Alerts
Get Instant News Updates
Enable
x
Notification Settings X
Time Settings
Done
Clear Notification X
Do you want to clear all the notifications from your inbox?
Settings X
X
First Name
Last Name
Email Address
Gender
  • Female
  • Male
  • Others
Age
NA
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+
>