For Quick Alerts
ALLOW NOTIFICATIONS  
For Daily Alerts
Oneindia App Download

PM Modi to inaugurate strategic Atal Tunnel at Rohtang on October 3

|
Google Oneindia News

New Delhi, Oct 01: Prime Minister Narendra Modi will inaugurate the strategically important all-weather Atal Tunnel, which reduces the distance between Manali and Leh by 46 km and the travel time by four to five hours, at Rohtang in Himachal Pradesh on Saturday.

Narendra Modi

"After the inauguration function, PM Modi will also attend public functions at Sissu in Lahaul Spiti and at Solang Valley," the Prime Minister's Office said on Thursday.

Hathras gang-rape case: Rahul, Priyanka set off on foot to meet victim's familyHathras gang-rape case: Rahul, Priyanka set off on foot to meet victim's family

Atal Tunnel is the longest highway tunnel in the world, and the 9.02 km long tunnel connects Manali to Lahaul-Spiti valley throughout the year, the PMO said, noting that the valley was earlier cut off for about six months every year due to heavy snowfall.

The tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3000 metres (10,000 feet) from the Mean Sea Level (MSL). The south portal (SP) of Atal Tunnel is located at a distance of 25 km from Manali at an altitude of 3,060 metres, while the north portal (NP) of the tunnel is located near village Teling, Sissu, in Lahaul Valley at an altitude of 3,071 metres.

Hathras gang-rape case: Akhilesh Yadav slams Centre, says BJP is showing its true colours Hathras gang-rape case: Akhilesh Yadav slams Centre, says BJP is showing its true colours

"It is a horse shoe shaped, single-tube double lane tunnel with a roadway of 8 metres and has an overhead clearance of 5.525 metres," the PMO said. Atal Tunnel has been designed for traffic density of 3000 cars per day and 1,500 trucks per day with max speed of 80 kmph.

Recommended Video

Hathras sealed ahead of Rahul and Priyanka Gandhi's visit|Oneindia News

The Atal Bihari Vajpayee government had taken the decision to construct the strategic tunnel below the Rohtang Pass on June 3, 2000, and the foundation stone for the access road to the south portal of the tunnel was laid on May 26, 2002.

"The Border Roads Organisation (BRO) worked relentlessly to overcome major geological, terrain and weather challenges that included the most difficult stretch of the 587-metre Seri Nalah Fault Zone. The breakthrough from both ends was achieved on October 15, 2017," the statement said.

For Daily Alerts
Get Instant News Updates
Enable
x
Notification Settings X
Time Settings
Done
Clear Notification X
Do you want to clear all the notifications from your inbox?
Settings X
X