Get Updates
Get notified of breaking news, exclusive insights, and must-see stories!

Chennai Power Cut On February 7: Over 110 Locations To Be Hit By Power Supply On Friday

Over 110 locations in Chennai, the capital city of Tamil Nadu, will be hit by power supply on Friday, February 7.

The Tamil Nadu Generation and Distribution Corporation is carrying out maintenance work in Nolambur, Ayapakkam, Kavanur, Manapakkam, Siruseri, Sothuperumbedu and Thiruverkadu due to which there will be a five-hour power outage between 9 am and 2 pm.

Chennai Power Cut On February 7

Nolambur

  • SP Garden
  • VGN Monte Carlo
  • SRR Nagar
  • Raja Garden Area
  • Guru Samy Road
  • Nolambur Phase 1 to 2
  • Union Road
  • VGN Nagar Phase 1 to 4
  • 1st to 8th Block
  • Kambar Salai
  • Kavimani Salai
  • Bharathi Salai
  • Annamalai Avenue
  • Meenakshi Avenue
  • Reddy Palayam Avenue
  • MCK Layout
  • MGR University
  • Panan Solai Street
  • Madha Koil Area
  • Perumal Koil Area
  • Gajalakshmi Nagar
  • Vembuli Amman Area
  • Sri Ram Nagar
  • Pachaiyappan Nagar
  • Sakthi Nagar
  • Pada Salai Street

Ayapakkam

  • TNHB Ayapakkam
  • VIP Box
  • Kottaimedu
  • Kollakala Camp
  • Raja Ammal Nagar
  • Kamarajar Nagar
  • St Pt College Road
  • TNHB 608 Flats

Kavanur

  • Sirukalathur
  • Kelithpettai
  • Nandambakkam
  • Periyar Nagar
  • Anjugam Nagar
  • Malayambakkam
  • Kundrathur
  • Bazzar Street
  • Metha Nagar
  • Manancherry G Square

Manapakkam

  • RE Nagar (5th to 9th Street)
  • Krishna Nagar
  • Duraisamy Nagar
  • Ramakrishna Nagar Annex
  • Part of Kundrathur Main Road
  • Siddharth Apartment

Siruseri

  • Hiranandhini Apartment
  • Olympia Apartment
  • Navallur
  • Siruseri Sipcot IT Park (Complete Area)
  • Thalambur
  • Siruseri
  • OMR Road
  • Sipcot
  • Pudupakkam
  • Arihant Apartment
  • Vaniyamchavadi
  • Kazhipattur
  • JJ Nagar
  • Muthama Nagar
  • Anand Engineering College
  • Srinivasa Nagar
  • Padur
  • Kazhipattur

Sothuperumbedu

  • Giruthalapuram
  • Budhur
  • Arumanthai
  • Vichoor
  • Mettupalayam
  • Kandigai
  • Vellivoyal

Thiruverkadu

  • Devi Nagar
  • Bakyalakshmi Nagar
  • Puliambedu Periya Theru
  • Noombal Main Road
  • PH Road
  • Aishwarya Garden
  • Ponniamman Nagar
  • RajanKuppam
  • Metro City Phase 1
  • VGN Mahalakshmi Nagar
  • Yadaval Street
  • Perumal Koil Street
  • Padasali Street
  • Chennai New City
  • Rajiv Gandhi Nagar
  • Chetty Main Road
  • Perumal Koil Street
  • Melayanambakkam
  • Padavattuamman Koil Street
  • Eden Avenue
  • Vijaya Nagar
  • Saraswathy Nagar
  • Srinivasa Pillai Street
  • Pachiappan Nagar
  • Konrajkuppam
  • Lotus Avenue
  • Nova
  • RDL Nagar
  • Perumal Koil Street
  • Koladi

The power will resume if maintenance works are completed before the scheduled time.

However, At least 45 locations in parts of Tamil Nadu's capital Chennai will be hit by power supply on Thursday. Parts of Thiruverkadu, Chendurpuram, Porur and Redhills are hit by power supply.

Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+