Get Updates
Get notified of breaking news, exclusive insights, and must-see stories!

Electric locomotive factory to be set up at Madhepura

New Delhi, Feb 22 (UNI) A greenfield high horsepower electric locomotive factory will be set up at a cost of Rs 1294 crore at Madhepura in Bihar, once the parliamentary constituency of Railway Minister Lalu Prasad.

This was announced by Finance Minister P Chidambaram after a meeting of the Cabinet Committee on Economic Affairs (CCEA), presided over by Prime Minister Manmohan Singh.

After becoming operationalised, it will produce 120 electric locomotives of high horsepower annually.

Railway Ministry sources said these electric engines would be of 6000 horsepower.

Mr Chidambaram said work on the factory would start this year and it would be completed in three years.

While presenting his first Railway Budget in 2004, Mr Prasad had announced setting up a new production unit for wheel manufacturing at Chapra, the Lok Sabha constituency represented by him.

UNI

Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+