Delhi Metro completes another tunnel
The tunnel, between INA and South Extension Market in south Delhi, is part of the 58.467-km long corridor between Majlis Park in Mukundpur to Shiv Vihar of the Phase III network, to be completed by 2016-end.
The tunnel boring machine was lowered at the INA shaft in October 2013.
The Majlis Park-Shiv Vihar corridor consists of about 14 km of underground lines.
IANS
Comments