Electric train introduced in Cuttack-Paradeep section

Subscribe to Oneindia News

Bhubaneswar, Aug 4 (UNI) Passenger trains with electric engines became operational from today between Cuttack and Paradeep, replacing the traditional diesel engines being used till now.

Divisional Manager, Railway, Khurda Road, R Venkadasamy flagged off the Palasa-Paradeep-Palasa via Cuttack passenger train with electric engine at Cuttack.

The electrification of the Cuttack-Paradeep double line section was completed in July at a cost of Rs 97.02 crore.

Railway sources claimed that the change over from diesel to electric engine would save approximately 15 minutes time out of a total journey period of two hours and reduce operational and manpower cost.

The railway authorities asserted that the electrification of Cuttack-Paradeep line and the operationalisation of the second railway bridge over river Mahanadi would ease traffic congestion at Cuttack and improve the punctuality of the trains considerably.

UNI BD DPM DB2008

Please Wait while comments are loading...