Central team to conduct study on Rubber Dam

By Staff
|
Google Oneindia News

Pathanamthitta, Sep 18 (UNI) A three-member Central team today visited the dam on river Pampa at Aranmula to study the viability and feasibility of the proposed Rubber Dam.

The dam, estimated to cost Rs 10 crore, would be constructed 300 metres downstream of Sathrakkadavu at Aranmula, the race course of Uthruttathy Snake Boat Festival.

The Central team included Chief Engineer attached to inland waterways T P Singh and Chief Engineer attached to Central Water Commission H K Khanda.

The Rubber Dam would help to maintain optimum water level in Pampa. The team held discussions with District Collector Ashok Kumar Singh, Water Resources officials and District Tourism Promotion Council personnel.

A detailed report would be submitted by the team to the Central Water Resources Ministry as early as possible.

UNI

For Daily Alerts
Get Instant News Updates
Enable
x
Notification Settings X
Time Settings
Done
Clear Notification X
Do you want to clear all the notifications from your inbox?
Settings X
X